A message about a 60-day restriction can refer to different events. Identify the event and the registrar's recorded release date before starting another transfer. This guide concerns generic domains governed by the ICANN Transfer Policy; country-code domains can have different rules.
IN THIS ARTICLE
01 Check the event that started the restriction
- Initial registration: a transfer can be restricted during the first 60 days after creation.
- Recent registrar transfer: a further move can be restricted for up to 60 days, subject to the policy's exceptions.
- Change of registrant: a qualifying contact change can trigger a separate 60-day transfer lock. A registrar may offer an opt-out before that change is requested.
02 Prepare a transfer date you can rely on
- Find the current registrar in authoritative registration data.
- Ask which event created the restriction and obtain its exact start and release timestamps. A public last-update date can reflect an unrelated event.
- Check the planned release against your renewal deadline. Renew if necessary through the appropriate existing workflow.
- Keep the current contact address accessible and postpone optional registrant changes until you have agreed the correct sequence.
- After the restriction ends, review the remaining domain status, unlock the ordinary transfer lock if appropriate and obtain the current authorisation code.
Why did switching off the transfer lock not solve the problem?
The control-panel switch can govern an ordinary registrar lock while a timed policy restriction remains in force. The interface cannot be assumed to remove every registry or policy condition. Ask for the specific rejection reason instead of repeatedly toggling the switch.
Owning the domain already does not make the transfer an exception automatically. If you believe the recorded event or date is wrong, provide the registration or previous transfer receipt for investigation. Do not change ownership details to try to bypass the restriction; that can introduce another approval or lock.
A transfer window is also not a promise that all other requirements are satisfied. Confirm authorisation, funding and eligibility close to the planned submission date, then track the single resulting operation through completion.